| Overview

The ClimaVision smart devices, which are part of a BMS (Building management system), communicate with the CCU and the BMS application using various levels of bands in the 900 MHz networks.

When the ClimaVision smart devices are installed for different customers in two different buildings, or in the same building on two different floors, or on the same floor in two different sections, or two different CCUs are squeezed into a smaller space for the collection of two different types of data.

There is always a chance that the data communicated from one device to its corresponding CCU can interfere with the data communicated by another device to its corresponding CCU.

To address this issue, the ClimaVision has introduced a concept of Transmission power in its smart devices, which can be set at a lower value for devices communicating with two different CCUs, in very small spaces or very close to each other.

| Setting the Transmission Power in MyStat

From the home UI screen of the Mystat.

  • Press and hold both the up arrow and down arrow buttons for 3 seconds

The Inputs screen Displays as below.

Input Screen.png

  • Press the icon button until you navigate to the installer option screen.

Installer Screen.png

  • Press the down arrow button to access the options on the screen.

Installer Screen (2).png

  • Navigate to the Transmission Power option.

Installer Screen-3.png

  • Press the icon button to access transmission power.

Installer Screen-7.png

  • Press the up or down arrow buttons to set the required Transmission power from any of the following.

  • Press the Confirm to confirm the selection.

The required transmission power is set, and the installer options screen displays.

Installer Screen.png

Previous
Next

Comments

0 comments

Please sign in to leave a comment.

Was this article helpful?

0 out of 0 found this helpful
Powered by Zendesk