2 Minute Read
| Overview
Special Schedule is a schedule which allows a Facility manager to introduce a schedule which is outside of the actual set of building and zone schedules. For example, a Facility manager would want to schedule the building on a Saturday for a small duration of time for which he would want the building HVAC equipment to run. A schedule like this on a Saturday which is outside of the actual building schedule has been made possible with the introduction of Special Schedule.
Special schedule is a schedule that once added will bypass building, zone, named schedule or any vacation for that zone for that time duration, acting as a type of a master schedule. This is quite similar to a vacation which can override any schedule, but in a reversible way.
Special schedule can be added for Building or zones via CCU, portal or App and will cascade to the other parts of the system.
| Creating a Zone Level Special Schedule
From the CCU zones screen,
- Access the zone for which you would like to create a special schedule
- Click the edit icon next to the zone schedule.
The zone schedule screen is displayed.
- Click the Add Special Schedule.
The special schedule window is displayed.
- Enter a name for the special schedule.
- Use the slider to set the desired temperatures.
- Use the start time and end time drop-down to select the duration of the schedule
- Use the calendar icon in the "Applies to" field to select a date.
- Click Save to confirm.
The special schedule at the zone level is added and the same will be applied to the zone of the building.
| Creating a Building Level Special Schedule
From the CCU zones screen
- Click the Building option.
The building section is displayed.
- Click the Add Special Schedule.
The special schedule window is displayed.
- Enter a name for the special schedule.
- Use the slider to set the desired temperatures.
- Use the start time and end time drop downs to select the duration of the schedule.
- Use the calendar icon in the "Applies to" field to select a date.
- Click Save to confirm.
The special schedule at the building level gets added, and the same will be applied to the building.
You can also add a schedule up to a duration of 24 hours as below.
| 7-Day Special Schedule
7- day special schedule is a concept introduced in the Carrier system, to enable users to set special schedules at building and zone levels, and further provides the flexibility to create a schedule based on a holiday calendar for a year at any specific date. The 7 days schedules can be set for any 7 days for a year, starting from today. We can consider an instance of a public holiday such as Thanksgiving Day or Republic Day where the vacation is taken into consideration while setting up the schedule.
With the introduction of a 7-day special schedule. The calendar in the special schedule scheduler opens up with today's date highlighted. And the seven calendar days from today enabled for selecting, and setting the schedule, as shown below.
- Select the seven days and click save to set a special schedule.
To select any other 7 days duration for the year
- Deselect the current date to enable navigation through the other months of the year.
- Use the arrow icons to navigate through the months of the year.
- Select a start date.
The consecutive 6 dates are enabled for selection as below
- Select the 7 days.
- Click save to confirm the special schedule.
The 7-day special schedule gets created as shown below.
Comments
0 comments
Please sign in to leave a comment.